Model: | B-T-225(A~E) | Internal: | 60x75x50 |
---|---|---|---|
External Dim: | 90X177X130 | Power Source: | AV:220V/380V 50/60Hz |
Heat-up Time: | ±1.0℃/±3.0℃RH | Temp&Humi.Deviation: | -40℃-150℃ |
Relative Humidity: | 20%~98%RH | HighTemp Rang: | +80℃~200℃ |
Interior: | SUS#304Stainless Steel Plate | Exterior: | Coating Or SUS#304Stainless Steel Plate |
Highlight: | High Temperature Chamber GB10592-89,Programmable Lab Climatic Chamber |
Climatic Chamber Lab Machine GB/T2423.2 Programmable High Temperature Chamber GB10592-89
High low temperature test chamber is used to test the change of material under extremely high temperature and extremely low temperature environment that continue alternation in the shortest time, Testing the chemical changes or physical damage of material caused by the thermal expansion and contraction. Testing box divided two parts, one is high-temperature region, another is low-temperature region, the testing sample placed on the moving basket, using unique heat storage and cool storage, the cylinder taking basket moves up and down in the hot and cold region to complete the hot and cold temperature impact testing; applied to test the material, including metal, plastic, rubber, electronics and other materials, it can be used as a basis for improvement of their products.
Programmable High Temperature Chamber is made in accordance with the light of new chemicals Pharmaceutical stability testing guidelines and humid test chamber technical conditions. The equipment may prepare a long and stable operating temperature and humidity environment by pharmaceutical scientific method for evaluation of drug failure require. It is used for companies to test drugs and calibration and stability tests for new drugs. Pharmaceutical stability chambers to meet the accelerated test, the test of long-term and high-humidity test, international organizations to identify new ICH stability testing conditions are also among the above range. Users can also press the unit Drug stability test chamber to arrange work requirements.
The constant temperature and humidity test chamber is composed of two parts: temperature regulation (heating, cooling) and humidification. Through the rotating fan installed in the top of the box, the air is discharged into the box to achieve gas circulation and balance the temperature and humidity inside the box. The data collected by the built-in temperature and humidity sensor of the box is transmitted to the temperature and humidity controller (micro information processor) for editing and processing, and the temperature and humidity control instructions are issued. Through the air heating unit, condensing pipe and the tank heating and evaporation unit.
Constant temperature and humidity box temperature regulation is through the box built-in temperature sensor, data collection, temperature controller (micro information processor) adjustment, connected to the air heating unit to increase the temperature or adjust the refrigeration solenoid valve to reduce the temperature in the box, in order to achieve the required temperature control. Constant temperature and humidity box humidity regulation is through the body set humidity sensor, data collection, humidity controller (micro information processor) adjustment, connected to the tank heating element, through the evaporation of water in the tank to increase the humidity in the box or adjust the refrigeration solenoid valve to achieve dehumidification, in order to control the required humidity.
operation:
Through three interconnected systems: refrigerant circulation system, air circulation system, electrical automatic control system.
1. Refrigerant circulation system of constant temperature and humidity test chamber: The liquid refrigerant in the evaporator absorbs the heat of the air (the air is cooled and dehumidified) and begins to evaporate. Finally, a certain temperature difference is formed between the refrigerant and the air. The liquid refrigerant also completely evaporates into the gas phase, and is then inhaled and compressed by the compressor (pressure and temperature increase). After being throttled through the expansion valve (or capillary), low temperature and low pressure refrigerant enters the evaporator to complete the refrigerant circulation process.
2. Air ring system of constant temperature and humidity test chamber: the fan is responsible for inhaling the air from the return air outlet, and the air is sent to the space required by the user through the air supply outlet after passing through the evaporator (cooling and dehumidification), humidifier and electric heater (heating). The sent air mixes with the air in the space and returns to the return air outlet.
PD-SO |
model | B-RUL-45 | B-RUL--60 | B-RUL-80 | B-RUL-100 | ||||||
design dimension | 45x45x45 | 60x60x60 | 80x80x80 | 100x100x100 | |||||||
carton size | 103x123x77 | 118x138x92 | 138x158x112 | 158x178x132 | |||||||
RT+10℃-200℃(1300°℃) | |||||||||||
economy |
model
|
DHG-9030A 101A-0S |
DHG-9070A 101A-1S |
DHG-9140A 101A-2S |
DHG-9240A 101A-3S |
DHG-9420A 101A-4S |
DHG-9620A | ||||
volume | 30L | 70L | 136L | 220L | 420L | 620L | |||||
Interior dimension | 350*350*350 | 450*350*450 | 550*450*550 | 600*500*750 | 640*585*1355 | 840*600*1355 | |||||
mmW*D*H carton size | 480*470*685 | 580*470*785 | 680*590*885 | 730*640*1085 | 780*750*1880 | 980*800*1880 | |||||
temperature fluctuation | ±1℃ | ±1℃ | ±1℃ | ±1℃ | ±1℃ | ±1℃ | |||||
temperature resolution | 0.1℃ | 0.1℃ | 0.1℃ | 0.1℃ | 0.1℃ | 0.1℃ | |||||
temperature control range | RT+10-250℃ | RT+10-250℃ | RT+10-250℃ | RT+10-250℃ | RT+10-200℃ | RT+10-200℃ | |||||
mains input | 220V 50HZ | 220V 50HZ | 220V 50HZ | 220V 50HZ | 220V 50HZ | 220V 50HZ | |||||
input powe | 650W | 1500W | 2000W | 2400W | 4000W | 4800W | |||||
volume | 30L | 70L | 136L | 220L | 420L | 620L |
Our Company:
FAQ:
Q: Are your company a trading one or a factory?
A: We are a factory over18-year experience.
Q: After an order is placed, when to deliver?
A: Generally about 25days. If we have inventory, we can arrange to ship within 3-5 days. Please be aware that our production lead times depend on specific items and item quantities.
Q: What about the product' services and quality?
A: We have Pre-service, middle-service and after-sale service. Can provide video training to show you how to install & operate. We can also arrange engineer to train the operation of equipment to customer's company when you need. Core components almostly are from the import.